skip to Main Content

Contact Us

APSN Education Services Ltd.

Address: 900 New Upper Changi Road, Singapore 467354
Phone: 6479 6252
Email: enquiry@apsn.org.sg

APSN Chaoyang School

Address: 8 Ang Mo Kio Street 54, #01-01, Singapore 569185
Phone: 6456 6922
Email: cys@apsn.org.sg

APSN Katong School

Address: 900 New Upper Changi Road Singapore 467354
Phone: 6643 0300
Email: ks@apsn.org.sg

APSN Tanglin School

Address: 8 Ang Mo Kio Street 54, #01-02, Singapore 569185
Phone: 6475 1511
Email: ts@apsn.org.sg

APSN Delta Senior School

Address: 3 Choa Chu Kang Grove Singapore 688237
Phone: 6276 3818
Email: dss@apsn.org.sg

APSN Ltd.

Address: 11 Jalan Ubi Block 2 #02-12 Singapore 409074
Phone: 6479 6252
Email: enquiry@apsn.org.sg

APSN Centre For Adults

Address: 11 Jalan Ubi Block 4, #01-31 Singapore 409074
Phone: 6346 2425
Email: cfa@apsn.org.sg

APSN Learning Hub

Address: 11 Jalan Ubi Block 6, #01-51 Singapore 409074
Phone: 6708 9867 / 8388 6252
Email: alh@apsn.org.sg

APSN Student Care Centre

Address: 8 Ang Mo Kio Street 54, #02-14 Singapore 569185
Phone: 6637 9812
Email: scc@apsn.org.sg

For APSN's whistle-blowing policy and reporting channel, kindly click here.

Installation of metal frame structures for construction


The speed of construction of commercial and warehouse buildings directly depends on the accuracy of the steel frame assembly. A violation of geometry during the installation of load-bearing supports leads to deformation of the floors and collapse of the spans under snow load.
Industrial installation of metal structures requires precise leveling of foundations and quality control of each weld. The reliability of anchorages and the competent slinging of multi-ton trusses ensure the safe transfer of the project from drawings to reality.
Foundation preparation and column
installation The installation work starts with a geodetic inspection of monolithic foundations. Specialists shoot through the height marks of the anchor bolts with a total station, checking the alignment of the actual axes of the building with the design coordinates. The deviation of the anchors by more than five millimeters requires cutting the threads and welding new embedded parts.
The metal columns are lifted by an automobile crane using textile slings. The I-beam support is guided by anchor bolts and slowly lowered onto steel leveling plates. The nuts are baited manually, after which the column is placed in a strict vertical with the help of plumb lines and laser levels.
The process of final fixing of the bearing supports:
- tightening the fastener with a torque wrench to the design force;
- installation of locking nuts to protect the thread from self-unscrewing;
- pouring non-shrinkable cement mortar under the metal base of the column.
Temporary extensions made of steel cable fix the columns in their design position until the entire frame is connected. Wind connections from the profile pipe are mounted diagonally between the supports, giving the building spatial rigidity. Fastening of ties is carried out with high-strength hardware with mandatory verification by a dynamometer.
Assembly of rafter trusses and floor beams
Large-sized trusses are welded from steel corners or profile pipes directly on the construction site. The assembly of enlarged blocks on the ground reduces the amount of high-rise work and improves the quality of nodal connections. The finished structure is checked by a flaw detector for hidden pores and slag in the welds.
The lifting of the truss weighing from three to five tons is carried out by two cranes to prevent skewing and twisting of the metal. Installers on tour towers accept the structure at height, aiming the mounting flanges of the truss at the seating positions of the columns. The connection is fixed with calibrated bolts hammered into the holes with a sledgehammer.
The technology of forming a hard disk cover:
- laying of steel purlins from the channel over the rafter trusses;
- welding of junctions with the application of a continuous angular seam;
- installation of horizontal cross ties to dampen wind loads.
The beams of the interstitial floors are supported by welded tables of I-beam columns. The crossbars are fixed with bolted connections using washers and grovers. A rigid grid of beams serves as the basis for laying a profiled sheet and pouring a monolithic reinforced concrete slab.
Anti-corrosion treatment and joint control
The steel elements of the frame are exposed to harsh moisture during the open installation stage. Flame retardants and anti-corrosion compounds are applied at the factory, but the welds and bolt assemblies are cleaned to a metallic sheen with an angle grinder. The bare metal is immediately covered with a primer with a high zinc content.
Ultrasonic flaw detection checks all responsible welded joints for microcracks. The uncooked areas are cut down with a plasma cutter and re-brewed using electrodes with a basic coating. The inspector marks the checked nodes with a personal stamp, confirming the seam's compliance with state standards.
The inspection of bolted connections is carried out selectively on 10 percent of the frame nodes. A special multiplier key measures the tightening torque of the nuts. After successful completion of the commission, the thread is painted over with protective enamel to prevent moisture from entering the coils and the development of hidden rust. Many newcomers to gambling appreciate articles that explain basic odds, betting limits, and bankroll tips before they decide to responsibly play at Casiny . Such guidance can help players understand how to enjoy casino games while keeping control over their spending and expectations.

Governing law and dispute resolution

This Privacy Policy shall be governed by and construed in accordance with the laws of the Republic of Singapore, and any claims or disputes of whatever nature arising out of or in connection with this Privacy Policy shall be subject to the exclusive jurisdiction of the courts of the Republic of Singapore.